How to use this legacy BACnet diagram
This page preserves an early building-integration illustration. The original notes mention two RS485 ports, one RJ45 port and browser-based configuration. They do not identify a current gateway model, its BACnet role or capacity, and do not provide project acceptance results.
For a new project, use the diagram as a connection concept. Confirm the field-device protocol, point list, physical interfaces and host-system communication role before selecting a current model.
- Check the exact model and hardware revision, matching manual, wiring and network plan.
- Establish communication with one device, then verify point addresses, data types, byte order, units and scaling.
- Confirm the required BACnet variant and compatible roles. Read a few verified points from the host system before expanding the configuration.
These are general selection and commissioning steps, not a report of what was implemented in the original project. See the connection guide and commissioning sequence, or review current models.
Original diagram and notes

-2 RS485,1 RJ45;
-Configuration by Website;

