Electricity-meter integration

At OSRAM Opto Semiconductors in Wuxi, China, three Sunfull X2BACnet protocol-conversion gateways connected electricity-meter data to the Johnson Controls Metasys system.

Acquisition and forwarding

The documented configuration used two RS485 buses per gateway, with 30 meters on each bus. Seven values were collected from each meter over Modbus, including current, voltage, power, active power and reactive power.

The gateways converted the collected data to BACnet/IP and provided it to Johnson Controls NAE network controllers for integration into Metasys. Operators could then configure the meter displays and monitor the meters within that system.

Original project diagrams

Electricity-meter acquisition at the Wuxi OSRAM site

X2BACnet gateway integration with Johnson Controls NAE

Johnson Controls Metasys monitoring interface